Alpitronic to build EV fast chargers at new South Carolina plant
The roughly $34 million factory will make 400 kW chargers and a 1 MW system for cars and heavy-duty trucks.
Key facts
Story- Alpitronic, the maker behind IONNA's fast chargers, is spending nearly $34 million on a new South Carolina factory.
- The plant will build 400 kW DC fast chargers and a 1 megawatt system for cars and heavy-duty trucks.
- The move is meant to boost production as Alpitronic chargers spread across the United States.
Alpitronic plans to build a new factory in South Carolina, with an investment of nearly $34 million. The company makes the fast chargers used by IONNA, and the new plant will expand its production in the United States.
The factory will make 400 kW DC fast chargers. It will also build a 1 megawatt (MW) system. That larger unit is designed to charge both passenger cars and heavy-duty trucks, which need far more power than most electric cars.
Alpitronic's chargers are already appearing across the country. The new plant is intended to meet growing demand for them. Its output will support the company's charging networks as more drivers and fleets switch to electric vehicles.
Fast charging is one of the biggest factors in whether people accept electric vehicles, and heavy-duty electric trucks depend on high-power sites like the 1 MW system.
The start date for production at the South Carolina plant has not been announced, and no timeline has been given for when the 1 MW system will be available. Prices and the number of jobs the factory will create have not been stated.
Worth your time?
One tap helps idly bring you more of what matters.
Advertisement